Contact

See Contact page
or, call
Mob: 0409 804 278

Categories
Archives

Monthly Archives: July 2016

Time to test $300m pa for USO?

This one page Economuse draws attention to the $3oom pa paid to Telstra for the “copper continuity obligation”, which maintains fixed copper services outside the NBN fixed network footprint. It suggests that changes to the definition of the USO and the growing availability of mobile services mean that there may be savings possible in a renegotiated contract. See Economuse 2016-07-14

Productivity Commission – Submission on USO

The Productivity Commission is taking submissions on the policy for the universal service obligation (USO). Submissions are due by 21 July. The draft report is expected in December with a final report to the Commonwealth bu April 2017.

My thoughts on the future of the USO are expressed at length in my Occasional Paper for ACCAN (see my publications page). But, I have submitted some key point in this 3 page submission USO-Prod.Com.July-2016